Over the past six months, the City engaged the services of engineering consulting firm McDowall Affleck to undertake community consultation and to develop a detailed design for road and drainage improvements in Adams Road Dalkeith.
In response to feedback from three earlier concepts issued to local residents for comment, McDowell Affleck have now developed a final concept design with more detailed design input, and are now seeking further feedback from the community prior to implementation.
Following feedback from residents, a revised drawing has been prepared by McDowell Affleck showing the modified the retaining wall longsection. This revised drawing shows in more detail the modifications proposed in terms of length/height of the wall.
Comments and suggestions on the proposed improvements closed on Friday 23 July 2010.