Upcoming Works
The City of Nedlands will be undertaking the following capital projects during 2011/2012:
Playground improvements
- Jones Park (Swanbourne: Upgrade of playground including the installation of shade sails – Status, consultation underway
- Masons Gardens (Dalkeith): Addition of new play equipment – Climbing Spider – Status, consultation underway
Reticulation
- Allen Park (Swanbourne): Installation of Central Control Capable cabinet
- Lawler Park (Floreat): Installation of Central Control Capable cabinet
- Melvista Oval (Nedlands): Installation of Central Control Capable cabinet
- Asquith Park (Mt Claremont): Upgrade of irrigation system with hydrozoning
- Tresillian Centre (Nedlands): Upgrade of irrigation system with hydrozoning
- Campsie Park (Nedlands): Upgrade of irrigation system with hydrozoning including new bore and submersible pump
- Mossvale Gardens (Floreat): Upgrade of irrigation system with hydrozoning including new bore and submersible pump
- Beatrice Road Reserve (Dalkeith): Upgrade of existing bore and submersible pump
- Zamia Park (Mt Claremont): New bore and submersible pump
Sports facilities
- Mt Claremont Oval: New soccer goals and fencing – Status, completed
- Charles Court Reserve: Skate Park bank stabilisation
Oval and reserve improvements
- New Court Gardens (Mt Claremont): Repair of limestone wall, renewal of garden beds and planting of roses – Status, completed
- Prince Albert Court (Mt Claremont): Installation of water meter and landscaping – Status, completed
- Directors Gardens (Mt Claremont): Rehabilitation of pathway (120 metres)
- Allen Park (Swanbourne): Replace drinking fountain
- Beaton Park (Dalkeith): Replace wooden sign with metal standard sign
- Daran Park (Mt Claremont): Replace wooden sign with metal standard sign
- Stephenson Avenue (Verge): Install bollards and plant Greenway Corridor in the vicinity of Challenge Stadium
- Hamilton Park (Mt Claremont): Terracing of southern area and installation of combination bench seat
- Mt Claremont Oval: Completion of circuit path
Road resurfacing works
- Circi Circle (north between Curlew Street and Carroll Street)
- Underwood Avenue (south carriageway between Brockway Road and Selby Street)
- Bruce Street (Princess Road to Melvista Avenue)
- Railway Road (Aberdare Road to 180 metres south)
- North Street (West Coast highway to Walba Way)
- Smyth Road (Stirling Highway to 90 metres north)
- Loch Street (3 sections commencing at Stirling Highway)
- Archdeacon Street (Stirling Highway to Melvista Road)
- Alfred Road (Grayland Road to Strickland Street)
- Gordon Street (Hampden Road to Clifton Street)
- Odern Crescent (traffic modifications)
Shared paths/footpaths
- Beatrice Road (stage 2)
- Hooley Street (Greensview Road to end of cul de sac)
- Camellia Avenue (footpath widening)
- Lemnos Street (construct missing section)
Blackspot projects
- Stirling Highway/Broadway/Hampden (improve traffic flow at intersection)
- Elizabeth Street/Tyrell Road (median islands)
- Stirling Highway/Florence Street (median islands)
- Princess Road/Florence Street (median islands)
- Carrington Street/Broom Street (upgrade street lighting)
- Princess Road/Bruce Street (upgrade street lighting)
- Bruce Street/Elizabeth Street (roundabout)
- Birdwood Parade (on road cycle lane)
- Victoria Avenue (on road cycle lane)
Infrastructure
- Loftus and Napier sump refurbishments (new drainage)
Special projects
- Beecham Road retaining wall (stages 1 and 2)
- River wall (river wall reconstruction foreshore 3)